- Gold Ore Beneficiation Plant
- At the gold ore beneficiation plant, gold should be extracted from the ore. The processing plant alternates between treating ore from the mine open pit and from the underground mine. XSM Machinery is one of world leading suppliers of complete gold ore...
more>>
- Limestone crushing line with capacity of 500-600 TPH
- In this limestone crushing line with capacity of 500-600TPH, after being blasted from quarry, the raw material (with sizes smaller than 930mm) will be transported to vibrating feeder, then to jaw crusher evenly and get primary crushed. The...
more>>
- 600-700tph granite/basalt crushing line
- After blasting, the raw stones below 1020mm will be fed into the vibrating feeder ZSW1500x600 from the dump truck. The stones will be fed into the jaw crusher PE1200X1500 continuously for primary crushing to be 150-300mm. After crushed by the jaw crus...
more>>
- 700-800TPH limestone production line
- After explosion, < 1020mm limestone will be conveyed into vibrating feeder by dumper, then the stone will be fed into jaw crusher for primary crushing, the discharged material is about 150-300mm; after primary crushing, the discharged material will be...
more>>